Interwaste removal, mining A1, A2 layers & screening A2 layers in dragline Eshidya

  • Location of Project : Eshidya Mine

  • Client : Jordanian Phosphate Company (JPMC)

  • Awarded date of Project : 4-2015

  • Quantities of Project :

  • Mining Phosphate (A1) quantities = 2.76 Million BCM ( Storage )

  • Inter waste (IW1 ) removal quantities = 1.5 Million BCM

  • Mining Phosphate (A2) quantities = 2.11 Million BCM

  • Screening & Crushing (A2) quantities = 2.63 Million ton

  • Completion = 100 %

Scope of Work:

  • Internal waste Removal using excavators & wheel loaders and transporting the OB to the waste yards and cleaning with dozing.

  • Phosphate Mining layers A1 & A2 Cleaning by graders and dozers.

  • Transportation using dump truck to screen unit (A2).

  • Crushing & Screening A2 Quantities

  • Operate (closed vibrating plant system) which high by max. the yield and min. rejection.

  • Feeding 50cm hopper by wheel loaders & dump trucks

  • Classification / separation of materials by grizzly

  • Crushing & sizing the materials to pass 100% of -8mm

  • All materials handled by conveyor belts

  • Transport product to banker then go to stacker then dispatching

  • Mixing & blending the product to get the required homogenous

  • Hauling the oversize (reject) material to waste yards (Stockpiles) and dozing

  • All productivity maintenance activities of conveyor belts and vibrating screens plants performed by in house team .