Interwaste removal, mining A1, A2 layers & screening A2 layers in dragline Eshidya
-
Location of Project : Eshidya Mine
-
Client : Jordanian Phosphate Company (JPMC)
-
Awarded date of Project : 4-2015
-
Quantities of Project :
-
Mining Phosphate (A1) quantities = 2.76 Million BCM ( Storage )
-
Inter waste (IW1 ) removal quantities = 1.5 Million BCM
-
Mining Phosphate (A2) quantities = 2.11 Million BCM
-
Screening & Crushing (A2) quantities = 2.63 Million ton
-
Completion = 100 %
Scope of Work:
-
Internal waste Removal using excavators & wheel loaders and transporting the OB to the waste yards and cleaning with dozing.
-
Phosphate Mining layers A1 & A2 Cleaning by graders and dozers.
-
Transportation using dump truck to screen unit (A2).
-
Crushing & Screening A2 Quantities
-
Operate (closed vibrating plant system) which high by max. the yield and min. rejection.
-
Feeding 50cm hopper by wheel loaders & dump trucks
-
Classification / separation of materials by grizzly
-
Crushing & sizing the materials to pass 100% of -8mm
-
All materials handled by conveyor belts
-
Transport product to banker then go to stacker then dispatching
-
Mixing & blending the product to get the required homogenous
-
Hauling the oversize (reject) material to waste yards (Stockpiles) and dozing
-
All productivity maintenance activities of conveyor belts and vibrating screens plants performed by in house team .